-
This sheath is used for the protection of underground cables. It is available in ring (with draw needle) or in bar. The junction sleeve allows connection between two ends of sheaths. The seperator allows to facilitate the installation of sheaths and to split each one. The sheath end cap allows to seal the sheath by closing its end.
-
This connector is designed to establish a tap connection on low voltage underground networks. It is located in underground cast or injected boxes. It is used on a main cable, with synthetic or paper insulation, of type: - Circular or sectoral, - Copper or aluminium, - Solid or stranded core. The underground service box is designed to establish a single or double tap from one or 2 line connections from an underground network made up of round or sectoral conductors (as defined in NF C 33-210).
-
This connector is designed to be used with underground low voltage network for tapping or junction applications. It is implemented in underground cast or injected boxes. It can be used on aluminium, circular or sectoral type cables with paper or synthetic insulation. The underground network box is designed to establish the junction or tap from a round or sectoral underground network (as defined in the NF C 33-210 standard).
-
The fuse service module exists in 3 versions: 60A, 90A and 100A available in single or three phase kits depending on the model. In variation of the fused neutral, a triple neutral is possible. It is installed on the M12 standardized connection terminals of the set of bars support. It is used to tap a single or three phase service connection ensuring protection through fuses size 00 (60A and 90A modules) or 22x58 (100A module). The multitap connection module comprises 1 neutral and 3 phases. It allows a maximum of 3 single phase or 3 three-phase services to be connected. It is installed on the M12 standardized connection terminals of the set of bars support. It is mainly used when the AD fuses are installed in the customer premises.
-
The REMIC module type RRCP offers a network outlet that can be cut (400 A function) or protected using maximum 200A fuses 115mm size 2 (200A function). It is installed on the M12 standardised connection terminals of the sets of bars supports. It is mainly used for supplying a collective or individual service with supervised power.
-
DIN cabinets exist in 3 widths and are designed to receive a 300, 450 or 600mm REMIC set of bars support. They use "common" equipment (direct connection network, service) and RRCP cutting / protection network connection modules. They are also designed for possible re-supply of the set of bars support without additional re-supply doors.
-
The protection plate roll (PPR) is designed to protect underground networks from extraction (pipes and/ or cables). It can be used for underground network under low load, engineering structure crossing, or in area of high density network. The warning netting is designed to indicate the presence of low voltage power line cables buried in the ground.